-40%
ICM Controls ICM286 Furnace Control Board - Goodman PCBBF112S, B1809926S
$ 25.84
- Description
- Size Guide
Description
ICM Controls ICM286 Furnace Control Board - Replacement for GoodmanThe ICM286 Furnace Control Board is a form, fit and functional replacement for Goodman's popular PCBBF112(S) or B1809926(S) control board. It features micro-processor based precision with a status LED for testing and easy troubleshooting.
Microprocessor-based precision
Controls inducer and blower fan motors, hot surface ignitor, and gas valve
Monitors timing, trial for ignition, flame sensing, pressure and limit switches, and lockout
Designed for 100% gas shutoff in case of ignition failure
Reverse polarity connection
Twinning compatible with another ICM286 board
Compatible with LP or natural gas
Diagnostic LED to aid in testing/troubleshooting
SPECIFICATIONS
Trial for ignition:
7 seconds
Pre-purge time:
15 seconds
Ignitor warm up time:
7 seconds
Post-purge time:
15 seconds
Total trials for ingition:
3 (auto reset after 1 hour)
Heat blower ON:
30 seconds
Heat blower OFF:
Selectable 90/120/150/180 seconds
Fan (Heat) ON/OFF delay:
1 second
Cool ON:
5 seconds
Cool OFF:
45 seconds
ELECTRICAL
Voltage Range:
Line (98-132 VAC) @ 60Hz
Cool Blower:
30A, 2 HP, 240 VAC
Heat:
20A, 240 VAC
Inducer Motor:
4A FLA, 8A LRA @ 120 VAC
Ignitor:
10A FLA @ 120 VAC
Humidifier:
5 amps @ 120 VAC
Electric Air Cleaner:
5 amps @ 120 VAC
Replaces
Goodman:
PCBBF112, PCBBF112S, B1809926, B1809926S, 0130F00005, 0130F00005S
Main Operation
On the application of power, the control will continuously monitor the rollout switch, limit switch, pressure switch, gas valve output and flame sense. During a Call for Heat, the control makes sure the limit switch is closed and the pressure switch contact is open before turning on the Inducer blower, which will be energized for 15-seconds in a pre-purge mode. Following the pre-purge period, the pressure switch contact is closed and power is applied to the hot surface ignitor (there is a 7-second warm-up period). The gas valve is energized if a flame is sensed during this 7-second trial-for-ignition period, the blower motor will turn on following a 30-second delay. When the call for heat ends, the control will turn off the gas valve, the inducer blower will turn off after a 15-second post-purge period, and the heat blower will turn off after the jumper-selectable period of time (if jumper is missing, default Heat Blower Off delay is 120 seconds). During a Call for Cool, the control will energize the cool blower after a 5-second delay. When the call for cool ends, the control will turn the cool blower off after a 45-second delay.
Twinning
The ICM286 is Twinning compatible with another ICM286 control board only. By connecting the designated “TWIN” screw terminals and the 24 VAC common together, the controls are designed to turn on/off the blower simultaneously and at the same speed. (NOTE: An external AC relay, whose coil is connected between R & W of the primary furnace and whose normally open contacts connect R & W of the secondary furnace, must be provided to cause both furnaces to heat). A common ground between the two furnaces is also required.